  • Date Completed: June 2011
  • Project Location: Wright-Patterson Air Force Base, OH
  • Project Category: Government
  • Project Owner: Wright-Patterson Air Force Base

This project consisted of two phases. The scope of phase one was to provide and install two 75-kVA and three 150-kVA PDUs, feeders and circuits in three separate data centers. The scope of phase two was to interrupt the electrical service feeding the data centers and to provide and install a new main-tie-main switchboard. The client could not allow the electrical outage to be longer than 18 hours and ESI worked closely with the owner to ensure that the transition went as planned. 